The aim of the project is to rehabilitate the existing internal power transmission network of Moldelectrica, the state owned Moldovan transmission system operator, in order to strengthen regional interconnections and to develop trade in regional electricity.

Конкретные цели
- To strengthen links with the European electricity system.
- To facilitate the integration of Moldova's transmission grid into the European Network of Transmission System Operators for Electricity (ENTSO-E).
- To design and rehabilitate a number of substations and transmission lines.
Ожидаемые результаты
- Improved security in the transmission network and energy efficiency.
- The replacement of the existing fleet of transformers to lead to an efficiency gain of about 30%, reducing CO2 emissions by about 1 5,000 to 20,000 tones of C02 per year.
Карта проекта
Фото галерея
ПОДРОБНОСТИ ПРОЕКТА
Молдова
Приоритетное направление:
Партнерство, которое озеленяет
Подсектор:
Энергетика и энергоэффективность
Тема:
Энергетика
Статус проекта:
Завершенный
Дата начала проекта:
11.12.2014
Дата окончания проекта:
09.10.2019
Номер проекта ЕС:
308-751