Lead IFI Remuneration for the Project ''Moldelectrica Power Transmission Network Rehabilitation"

Project Description
The aim of the project is to rehabilitate the existing internal power transmission network of Moldelectrica, the state owned Moldovan transmission system operator, in order to strengthen regional interconnections and to develop trade in regional electricity.

Specific Objective
- To strengthen links with the European electricity system.
- To facilitate the integration of Moldova's transmission grid into the European Network of Transmission System Operators for Electricity (ENTSO-E).
- To design and rehabilitate a number of substations and transmission lines.
Expected Results
- Improved security in the transmission network and energy efficiency.
- The replacement of the existing fleet of transformers to lead to an efficiency gain of about 30%, reducing CO2 emissions by about 1 5,000 to 20,000 tones of C02 per year.
Project map
Photo gallery
PROJECT DETAILS
Moldova
Priority Area:
Partnership that greens
Subsector:
Energy & energy efficiency
Topic:
Energy
Project Status:
Completed
Start Date:
11.12.2014
End Date:
09.10.2019
EU Project Number:
308-751